The ice arena was built according the standarts of International Hockey Federation.
The date of operation: 01.11.2008
The description of the object:
The compleat build cycle (from the begining of ground works till start of operation)
The size is 30 х 60 m
The fundation is made of concrete, with heating of ground against frost penetration
The standard boards IIHF, which are made in Czech Republic – double glass, glass with counters and with protective net
The refrigerating machine with a power 580 kWt with recuperation of heat. The recuperation system uses heat for the ground heating, for the meltting system and for air-preheating in the air-handling unit. Also the heat is used for the swimming-pool heatting
The tribune for the audience can contain 450 people
The hockey lane markings
The building has metall structure and is sendwich-panel-sheathed